【ZEROSAI Case Study】Quick Protective Measures in a Wide Range of Sites
Instructions can be given on-site from anywhere! Case study of solar power plant construction project.
We will introduce the implementation results of the natural disaster prevention system "ZEROSAI." In the solar power plant construction project of a private company, concerns arose about the inflow of sediment due to rainfall. Since the site is extensive, it was necessary to detect issues in advance and take early protective measures, so "ZEROSAI" was introduced. After the implementation, by using the highly accurate "disaster prevention board" for pinpoint predictions, it became possible to plan for work interruptions, the start of protective measures, and the resumption of work, thus avoiding unnecessary labor and time. Additionally, weather conditions at the site could be checked using tablets and smartphones. This enabled instructions to be given to the site from anywhere at any time, resulting in the site being able to carry out protective measures quickly without wasting time. [Case Study] ■ Objectives - The site is extensive, so it is necessary to detect issues in advance and take early protective measures. - We want to conduct work while constantly monitoring weather conditions. ■ Effects - We were able to plan for work interruptions, the start of protective measures, and the resumption of work. - Weather conditions could be checked using tablets and smartphones. - Instructions could be given to the site from anywhere, allowing for quick execution of protective measures. *For more details, please refer to the PDF document or feel free to contact us.
- Company:シスメット 本社/福岡県北九州市 ・東日本営業所/埼玉県入間市 ・北日本営業所/北海道札幌市
 - Price:Other